|
The Yellow MRT line is a planned elevated mass rapid transit line to be built in Bangkok, Thailand. The 30.4 km long Yellow line will have 23 stations (3 of which will be built later) and cost 49 billion baht. It was originally proposed to be an underground and elevated heavy rail line. However, it now planned that it will be built as an elevated monorail line. Once the Yellow Line is complete, a future extension may eventually be built from Samrong across the Chao Praya river to link with the MRT Purple Line at Rat Burana. ==Alignment== The Lat Phrao to Hua Mark section starts at the intersection of Ratachadapisek and Lat Phrao roads where the Yellow Line interchanges with the MRT Blue Line (Lat Phrao station). The line heads east along Lat Phrao road to Bangkapi junction where it will interchanges with the proposed Orange Line. The line then heads south along Srinagarindra rd to Hua Mark where it will interchange with the Airport Rail Link (Phattanakan station). (Phase I) From Hua Mark the route continues south along Srinagarindra rd past Bangna-Trat rd all the way to Thepha Rak rd in Samut Prakhan Province. The Line then heads west along Thepha Rak rd before teminating at Samrong where it will interchange with the BTS Sukhumvit Line (extension under construction). (Phase II) 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「MRT Yellow Line」の詳細全文を読む スポンサード リンク
|